Hotline:010-84945188/5288

Weibo     Recruitment    

Reservoir Engineering

Reservoir Engineering:

The conventional well test
Special process pressure test
Production logging
Cable operation
The permanent pressure monitoring
Fishing
Oil testing
Reservoir study
Non-flowing well testing
Stress monitoring
 
Pressure Monitor Service:
 
Analysis of surface direct reading in Canada permanently installed with pressure monitoring system and information service system. Using this system can effectively realize the downhole pressure, temperature monitoring and timely data transmission and analysis of ground.
 
The downhole string hanging or production pipe column fishing methods, the storage pressure gauge production layer near, long-term monitoring of the bottom hole pressure, temperature; pump pressure gauge in the underground continuous working time of up to 1 year.
 
Direct reading type permanent pressure monitoring.
 
Using the data loading pump power supply cable electric pump cable transmission permanent monitoring, the data pump working state parameters, pressure, temperature monitoring instrument to collect timely transmission to the ground data acquisition system, and through the remote transmission, to achieve the timely monitoring and analysis of oil well electric pump, the well cylinder pressure, temperature data.